İstanbul Gökçen New Hangars Electric-Electronic Applications Turnkey Construction Work A total of 5 hangars of 8000 m2, including 2 midi, 1 green, 1 blue and 1 red turnkey electrical works of 1700 m2 workshops in hangar buildings, In addition to the existing installation gallery, it is 2 meters wide, 2.60 meters high and 170 meters long. All electrical works of the installation gallery, which is an additional installation of approximately 16.000 m2 Apron area. lighting, automation and power distribution works were also carried out within the scope of this project. 13 pieces of 18 m Lift Lighting Poles and Lighting Fixtures have been installed in the apron area. Aprpn lighting is provided. Lighting has been done inside the building. Within the scope of this project, new lighting and all infrastructure distribution projects are national and international. It has been redesigned and redesigned by DMY in accordance with standards and regulations. is implemented. Thus, Hangar applications have been added to our Airports expertise journey.